Main factor causing the malfunction of the automatic casing machine

Automatic wear casing machine boot steps: cleaning material ------- check (double pressing block inside the waste and clean) -- exit -- operation
Abnormal in work:
Quit - - - - - - check (as) - quit - run
A plug, Teflon casing failure
1 the wire guide needle selection is too large, check and choose the right delivery pipe guide wire
2 double pressure block pre pressure gap is too small or too large, check and debug the preloading slot (Teflon sleeve cannot from the side out)
3 double pressure block closed open is not flexible, in the side of the shaft sprayed WD-40 anti rust oil, and clean with the dust gun clean
Two, automatic wear casing machine plug line fault
1 the wire guide wire selection is too large, check the wire guide is reasonable, and replace the wire to reduce a model of the mouth
2 wire guide wire selection (copper barely through) to increase a model
3 wear the wire wheel, replace the new wheel, and adjust the tension of the little L arm
4 Teflon tube incision is not round, the replacement pipe cutting blade
5 wire feeding guide needle and double pressure block distance is too large (two of the distance 0.1mm, please use our confirmation to gauge the distance)
Three, automatic wear casing machine other failure
1 motor vibration does not run: check the data line link or directly replace the control box.
2 back line not line mouth inside: lengthen the length of the wire, send wire wheel wear, replace the new wheel. Check the clip line into the action is slow, if the slow change control clip line into the solenoid valve.
3 noise in the operation of the muffler, check the solenoid valve, the replacement tangent knife cylinder
4 other leaks, check the stainless steel joints are loose or replacement of stainless steel joints
The more sweet remind:
Automatic wear casing machine note
1 select the appropriate casing and wire guide wire needle
2 when cleaning material, we must check and clean the double pressure block inside the waste and confirm the double press block can be closely after the launch of the run
3 air pressure operation greater than 5.5 kg of air pressure
4 adjustable double pressure block suitable for preloading height (pressure regulating block with different height according to different Teflon sleeve)