Operation steps of the HY-Z03 manual double cylinder vacuum with the immersion machine
Dongguan Hui,, the more scientific and technological vacuum with a dip in the use of hydraulic rod support. The top cover is sealed with silicone rubber, and the quick clip is closed. Body with: manual function, with time can be set; with a time alarm, motor overload protection and lack of protection function. The following by the more small series to introduce.

1, open the cover of the cover, will be placed in a clean product containing the dip plate placed in the cylinder bracket. Close the cover and lock on the quick clip.
2, twist start switch, vacuum pump start. When the cover on the pressure gauge shows to 30-40mmhg, open the cylinder below the valve switch, the varnish is pumped into the cylinder.
3, twist lamp switch, through the observation of the glass cover, when the desired amount of varnish, close the cylinder valve switch down.
4, when the pressure gauge pointer to 700mmhg above, press the start switch to stop. Time to set the time to set the alarm. Open the lid on the valve switch, discharge gas, when the pressure gauge pointer to 0mmhg. Open the cylinder below the valve switch, the cylinder will put valitin water as much as possible, close the valve switch.
5, will start the switch, the vacuum pump starts. When the pressure gauge pointer reaches 700mmhg above, press the 2 stop switch. To set the time when the alarm, open the lid on the valve switch, gas emissions.
6, after the completion of the vacuum, open the cylinder head, take out the product, the operation is completed.